|
19 CSR 30-62.032 Organization and Administration
Compliance
|
19 CSR 30-62.042 Initial Licensing Information
Compliance
|
19 CSR 30-62.052 License Renewal
Compliance
|
19 CSR 30-62.082 Physical Requirements of Group Day Care Homes and Day Care Centers
Violation
| Provider Comments |
Violation The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by the resilient material used is unapproved in that concrete was located beneath the piece of outdoor play equipment. Licensing Rule Reference 19 CSR 30-62.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 5. states: The fall-zone area under and around outdoor equipment where children might fall and be injured shall be covered with impact absorbing materials which will effectively cushion the fall of a child. This material may include sand, pea gravel, tanbark, shredded tires, wood chips, rubber matting or other approved resilient material. Correction Required The facility shall maintain approved resilient material in all fall-zone areas.
Correction Verification Corrected on Site
Compliance Date 1/25/2018
|
|
Violation The facility's outdoor space was not safe for children's activities as evidenced by black ground cover coming through mulch presenting a tripping hazard. Licensing Rule Reference 19 CSR 30-62.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 4. states: The play area shall be safe for children's activities, well-maintained, free of hazards such as poisonous plants, broken glass, rocks or other debris and shall have good drainage. Correction Required The outdoor play area shall be clean, safe and well-maintained as required.
Correction Verification Submit Documentation
Compliance Date
|
|
Violation The walls located in the Three year old room was/were not in good condition as evidenced by dents and chipping paint. Licensing Rule Reference 19 CSR 30-62.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces. Correction Required Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.
Correction Verification Submit Documentation
Compliance Date 1/25/2018
|
|
|
19 CSR 30-62.087 Fire Safety
Compliance
|
19 CSR 30-62.090 Disaster and Emergency Preparedness
Compliance
|
19 CSR 30-62.092 Furniture, Equipment and Materials
Compliance
|
19 CSR 30-62.102 Personnel
Violation
| Provider Comments |
Violation The requirements for documentation of 12 clock hours of annual training were not met as evidenced by there were insufficient training documents on file. The staff listed need the following documentation: Nicki Allen 3, Olivia Anaya 3, Sydney Boude 7, Jill Dowdy 7, Destinie Ellison 1, Jehna Flint 7, April Harris 1 hour & 10 min, Lauren Bolder 3, Jennifer Huffman 1, Jessica Hulsey 9, Saundra Linney 3, Taylor Mitchell 1 hour & 10 min, Doris Scarborough 1 hour & 10 min, Lydia Scarborough 6 hours & 45 min, Dixie Shelton 1 hour & 10 min,Caitlyn Calloway 10 minutes.. Licensing Rule Reference 19 CSR 30-62.102 Personnel (3) (A) states: The center director, group day care home provider, all other caregivers, and those volunteers who are counted in staff/child ratios shall obtain at least twelve (12) clock hours of child-care related training during each year of employment in training which is approved by the department in - health, safety, nutrition, guidance and discipline, appropriate activities and learning experiences for children, positive communication and interaction with parents, planning and setting up an appropriate environment for children, professional and administrative practices, or other child related areas. Correction Required Required training hours shall be documented for each employee.
Correction Verification Submit Documentation
Compliance Date
|
|
|
19 CSR 30-62.112 Staff/Child Ratios
Compliance
|
19 CSR 30-62.122 Medical Examination Reports
Compliance
|
19 CSR 30-62.132 Admission Policies and Procedures
Compliance
|
19 CSR 30-62.142 Nighttime Care
Compliance
|
19 CSR 30-62.152 Hourly Care Facilities
Compliance
|
19 CSR 30-62.162 Overlap Care of Children
Compliance
|
19 CSR 30-62.172 Emergency School Closings
Compliance
|
19 CSR 30-62.182 Child Care Program
Compliance
|
19 CSR 30-62.192 Health Care
Compliance
|
19 CSR 30-62.202 Nutrition and Food Service
Compliance
|
19 CSR 30-62.212 Transportation and Field Trips
Not Observed
|
19 CSR 30-62.222 Records and Reports
Compliance
|
RSMo 210.003 Immunizations of children required, when, exceptions--duties of administrator, report--notification of parents, when.
Compliance
|