| Compliance List |
5 CSR 25-300.020 Application for Annual Fire Safety and Health and Sanitation Inspections and Inspection Procedures
Compliance
|
5 CSR 25-300.040 Staffing Requirements
Compliance
|
5 CSR 25-300.050 Health Requirements
Compliance
|
5 CSR 25-300.060 Responsibilities of Caregivers
Compliance
|
5 CSR 25-300.070 Fire Safety Requirements
Violation
| | Provider Comments |
Violation Requirements of 19 CSR 30-60.080 Fire Safety were not met as evidenced by fire drills were not held at least one time every three months. Licensing Rule Reference 5 CSR 25-300.070 Fire Safety Requirements (5) states: Fire and tornado drills shall be conducted at least every three (3) months and shall include all children in care. Unscheduled drills shall be held at the discretion of the state fire marshal or department. Each fire drill shall include a complete evacuation of all persons from the building. Correction Required Fire and tornado drills shall be completed and recorded as required.
Correction Verification Submit Documentation
Compliance Date 1/10/2024
|
|
Violation Requirements of 19 CSR 30-60.080 Fire Safety were not met as evidenced by tornado drills were not held at least one time every three months. Licensing Rule Reference 5 CSR 25-300.070 Fire Safety Requirements (5) states: Fire and tornado drills shall be conducted at least every three (3) months and shall include all children in care. Unscheduled drills shall be held at the discretion of the state fire marshal or department. Each fire drill shall include a complete evacuation of all persons from the building. Correction Required Fire and tornado drills shall be completed and recorded as required.
Correction Verification Submit Documentation
Compliance Date 1/10/2024
|
|
|
5 CSR 25-300.080 Sanitation Requirements
Compliance
|
5 CSR 25-300.090 Physical Plant, Space, Supplies and Equipment
Violation
| | Provider Comments |
Violation The walls located in PS classroom on the main floor, in the hallway near the bottom of the stairs was/were not in good condition as evidenced by there are a few areas with chipping violet paint, and there is an area with peeling white paint near the bottom of the steps. Licensing Rule Reference 5 CSR 25-300.090 Physical Plant, Space, Supplies and Equipment 1 (F) states: Walls, ceilings, floors and equipment shall be finished with materials that can be cleaned easily and shall be free of splinters, cracks and chipped paint. Floor covering shall be in good condition. The facility shall be free of all lead hazards and asbestos that is friable or dangerous. Correction Required Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.
Correction Verification Submit Documentation
Compliance Date 1/17/2024
|
|
Violation The premises were not safe and suitable as evidenced by the outlets in the hallway are missing protective covers. Licensing Rule Reference 5 CSR 25-300.090 Physical Plant, Space, Supplies and Equipment 1 states: The premises of all facilities shall be safe and suitable for the care of children. Correction Required The premises shall be safe and suitable for the care of children.
Correction Verification Submit Documentation
Compliance Date 1/19/2024
|
|
Violation The equipment, a three slides, that is over 24 inches high, does not have sufficient impact absorbing material present as evidenced by there is no any resilient material present and slides are sitting on concrete. Licensing Rule Reference 5 CSR 25-300.090 Physical Plant, Space, Supplies and Equipment 4 (D) states: The fall-zone area under and around outdoor equipment over twenty-four inches (24") high covered with impact-absorbing materials that will effectively cushion the fall of a child. Materials may include sand, pea gravel, tanbark, shredded tires, wood chips, rubber matting or other approved resilient material. Correction Required Impact absorbent materials shall be in the fall zone for any equipment over 24 inches high.
Correction Verification Submit Documentation
Compliance Date 1/17/2024
|
|
Violation Equipment in the outdoor play area, the little red bike, a slide , and a playhouse , was not free of sharp, loose or pointed parts as evidenced by there is a crack on the seat of the bike, and there are exposed screws on the slide and the playhouse. Licensing Rule Reference 5 CSR 25-300.090 Physical Plant, Space, Supplies and Equipment 4 (G) states: Outdoor equipment shall be safely constructed, in good condition, and free of sharp, loose or pointed parts. Stationary equipment such as swings, slides and climbers shall be anchored securely. Correction Required Play equipment shall be well maintained, safely constructed, free of sharp, loose or pointed parts; stationary equipment shall be anchored.
Correction Verification Submit Documentation
Compliance Date 1/19/2024
|
|
|
5 CSR 25-300.110 Admission Procedures and Required Reports and Records
Compliance
|
5 CSR 25-600.020 General Requirements
Compliance
|
5 CSR 25-600.040 Background Screening Findings
Compliance
|
RSMo 210.003 Immunizations of children required, when, exceptions--duties of administrator, report--notification of parents, when.
Compliance
|
RSMo 210.115 Reports of abuse, neglect, and under age eighteen deaths--persons required to report--supervisors and administrators not to impede reporting--deaths required to be reported to the division or child fatality review panel, when.
Compliance
|
RSMo 210.201. Definitions. — As used in sections 210.201 to 210.257, the following terms mean:
Compliance
|
RSMo 210.254 Religious organization operating facilities exempt under licensing laws required to file parental notice of responsibility and fire, safety inspections annually.
Compliance
|
RSMo 210.255 Religious organizations operating facility in violation, procedure - noncompliance after notice, prosecutor may act or attorney general.
Compliance
|
RSMo 252. Fire, safety, health and sanitation inspections, procedures - variances to rules granted when - rules authorized.
Compliance
|