DHSS MO
MISSOURI DEPARTMENT OF ELEMENTARY AND SECONDARY EDUCATION

OFFICE OF CHILDHOOD

GROUP HOME AND CENTER INSPECTION REPORT
Facility Information

JUMP START LEARNING CENTER, INC.

002203967

(314) 721-4452

7240 PAGE AVE
ST LOUIS
MO  63133

JUMP START LEARNING CENTER, INC.



 

MILLER, LAKEYSHA MICHELLE

jumpstartlearningcenter1@gmail.com

Incorporated

CHARMEL WILLIAMS

6 WEEKS - 16 YEARS

24

GROUP HOME AND CENTER

6 CHILDREN UNDER 12 MONTHS; 8 CHILDREN UNDER 24 MONTHS
 
Inspection Information

04/03/2025

N/A

N/A

N/A

COMPLIANCE VERIFICATION

2488595877


DocumentDocument-Date
SAMPLE WEEKLY MENU 03/01/2010
SAMPLE FORMS 03/01/2010
LOCAL ZONING APPROVAL 03/01/2010
LOCAL FIRE DEPARTMENT NOTIFICATION 03/01/2010
LOCAL BUILDING APPROVAL 03/01/2010
LINES OF ADMINISTRATIVE AUTHORITY 03/01/2010
JOB RESPONSIBILITIES 03/01/2010
DISCIPLINE POLICIES 03/01/2010
DIRECTOR'S QUALIFICATIONS 03/15/2010
DIAGRAM/OUTDOOR 03/01/2010
DIAGRAM/INDOOR 03/01/2010
DAILY SCHEDULE 03/01/2010
CHILD CARE PRACTICES 03/01/2010
ARTICLES OF INCORPORATION 03/01/2010
CERTIFICATE OF GOOD STANDING 03/27/2024
POLICIES 04/12/2016
APPLICATION 03/25/2020
STAFF SHEET 04/02/2024
FIRE/SAFETY INSPECTION 03/20/2024
ANNUAL DECLARATION 03/27/2024
EQUIPMENT LIST 03/27/2024
SANITATION INSPECTION 02/06/2024
LISTING OF CHILD CARE STAFF/HOUSEHOLD MEMBERS 04/02/2024

Overlap Start TimeOverlap End TimeOverlap Submit Date
  1:30PM   3:30PM   11/7/2022



Inspection determined facility to be in compliance with licensing rules.
Compliance Licensing Rules
Open Violations: NA
NOTE
The licensee is responsible for compliance with all licensing rules, including but not limited to the rules listed on this compliance report form.

Compliance List
5 CSR 25-500.032 Organization and Administration
Compliance
5 CSR 25-500.042 Licensing Process
Compliance
5 CSR 25-500.052 Annual Requirements
Compliance
5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers
Violation
 Provider Comments
Violation
The walls located in the preschool classroom was/were not in good condition as evidenced by several patches of peeling paint were present on the aqua wall.
Licensing Rule Reference
5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (2) (A) 6. states: Walls, ceilings and floors shall be finished with material which can be cleaned easily and shall be free of splinters, cracks and chipping paint. Floor covering shall be in good condition. Lead-free paint shall be used for all painted surfaces.
Correction Required
Walls, ceilings, and floors shall be made of approved materials, easily cleaned and in good condition.

Correction Verification
Submit Documentation

Compliance Date
3/10/2025
Violation
The fall-zone area under and around outdoor equipment where children might fall and be injured was not covered with impact-absorbing materials to cushion a fall as evidenced by no resilient material was present.
Licensing Rule Reference
5 CSR 25-500.082 Physical Requirements of Group Day Care Homes and Day Care Centers (6) (A) 5. states: The fall-zone area under and around outdoor equipment where children might fall and be injured shall be covered with impact absorbing materials which will effectively cushion the fall of a child. This material may include sand, pea gravel, tanbark, shredded tires, wood chips, rubber matting or other approved resilient material.
Correction Required
The facility shall maintain approved resilient material in all fall-zone areas.

Correction Verification
Submit Documentation

Compliance Date
3/10/2025
5 CSR 25-500.087 Fire Safety
Compliance
5 CSR 25-500.090 Disaster and Emergency Preparedness
Compliance
5 CSR 25-500.092 Furniture, Equipment and Materials
Violation
 Provider Comments
Violation
Requirements for the crib mattress/playpen padding/bedding were not met as evidenced by a fitted sheet was not used.
Licensing Rule Reference
5 CSR 25-500.092 Furniture, Equipment and Materials (1) (B) 2. D. states: The crib mattress or playpen pad shall be sized correctly to the crib or playpen, in good condition, waterproof and kept clean and dry, be firm and maintain its shape even when the fitted sheet designated for that model is used, such that there are no gaps between the mattress and the side of the crib or playpen. Only fitted sheets shall be used. Only fitted sheet shall be used and shall be changed immediately when soiled or wet.
Correction Required
Sleeping equipment shall meet safety and sanitation requirements.

Correction Verification
Submit Documentation

Compliance Date
3/10/2025
5 CSR 25-500.102 Personnel
Compliance
5 CSR 25-500.112 Staff/Child Ratios
Compliance
5 CSR 25-500.122 Medical Examination Reports
Compliance
5 CSR 25-500.132 Admission Policies and Procedures
Compliance
5 CSR 25-500.142 Nighttime Care
Compliance
5 CSR 25-500.162 Overlap Care of Children
Compliance
5 CSR 25-500.172 Emergency School Closings
Compliance
5 CSR 25-500.182 Child Care Program
Compliance
5 CSR 25-500.192 Health Care
Compliance
5 CSR 25-500.202 Nutrition and Food Service
Compliance
5 CSR 25-500.212 Transportation and Field Trips
Compliance
5 CSR 25-500.222 Records and Reports
Compliance
5 CSR 25-600.020 General Requirements
Compliance
5 CSR 25-600.040 Background Screening Findings
Compliance
RSMo 210.115. Reports of abuse, neglect, and under age eighteen deaths — persons required to report — supervisors and administrators not to impede reporting — deaths required to be reported to the division or child fatality review panel, when — report made to another state, when. —
Compliance
RSMo 210.211.  License required - exceptions - written notice of licensure status, when.
Compliance