| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous Areas - Enclosure
Hazardous areas are protected by a fire barrier having 1-hour fire resistance rating (with 3/4 hour fire rated doors) or an automatic fire extinguishing system in accordance with 8.7.1 or 19.3.5.9. When the approved automatic fire extinguishing system option is used, the areas shall be separated from other spaces by smoke resisting partitions and doors in accordance with 8.4. Doors shall be self-closing or automatic-closing and permitted to have nonrated or field-applied protective plates that do not exceed 48 inches from the bottom of the door.
Describe the floor and zone locations of hazardous areas that are deficient in REMARKS.
19.3.2.1, 19.3.5.9
Area Automatic Sprinkler Separation N/A
a. Boiler and Fuel-Fired Heater Rooms
b. Laundries (larger than 100 square feet)
c. Repair, Maintenance, and Paint Shops
d. Soiled Linen Rooms (exceeding 64 gallons)
e. Trash Collection Rooms
(exceeding 64 gallons)
f. Combustible Storage Rooms/Spaces
(over 50 square feet)
g. Laboratories (if classified as Severe
Hazard - see K322) |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
9/16/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
9/17/2019
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Hazardous areas shall be separated by construction of at least one- (1-) hour fireresistant construction. Hazardous areas may be protected by an automatic sprinkler system in lieu of a one- (1-) hour rated fire-resistant construction. When the sprinkler option is chosen, the areas shall be separated from other spaces by smoke-resistant partitions and doors. The doors shall be self-closing or automatic closing. II
|
9/16/2019
| | |
| Each smoke section shall be separated by one- (1-) hour fire-rated walls that are continuous from outside wall-to-outside wall and from floor-to-floor or floor-to-roof deck. All doors in this wall shall be at least twenty- (20-) minute fire rated or its equivalent, self-closing, and may be held open only if the door closes automatically upon activation of the fire alarm system. II
|
9/16/2019
| | |