Inspection Results
-
Facility failed to meet the following Requirement(s):Corrected DateLevel of HarmResidents Affected
Walls and ceilings, including doors, windows and skylights, shall be clean and maintained in good repair. III 12/28/2022   
Light fixtures, vent covers, wall-mounted fans, decorative materials and similar equipment attached to walls and ceilings shall be easily cleanable and shall be maintained clean and in good repair. III 12/28/2022   
When chemicals are used for sanitization, they shall not have concentrations higher than the maximum permitted under 21 CFR 178.1010 of the (Revised 2005), Food and Drug Code of the United States Food and Drug Administration, Department of Health and Human Services, and a test kit or other device that accurately measures the parts per million concentration of the solution shall be provided and used. III 12/28/2022   
Machines using hot water for sanitizing may be used provided that they are operated in accordance with the manufacturer ' s instructions and are maintained in good repair. II/III 12/28/2022   
Cleaned and sanitized utensils and equipment shall be stored above the floor in a clean, dry location in a way that protects them from contamination by splash, dust and other means. The food-contact surfaces of fixed equipment shall also be protected from contamination. III 12/28/2022