| Facility failed to meet the following Requirement(s): | Corrected Date | Level of Harm | Residents Affected |
| |
| | |
| |
| | |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Horizontal Exits
Horizontal exits, if used, are in accordance with 7.2.4 and the provisions of 18.2.2.5.1 through 18.2.2.5.7, or 19.2.2.5.1 through 19.2.2.5.4.
18.2.2.5, 19.2.2.5
|
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Discharge from Exits
Exit discharge is arranged in accordance with 7.7, provides a level walking surface meeting the provisions of 7.1.7 with respect to changes in elevation and shall be maintained free of obstructions. Additionally, the exit discharge shall be a hard packed all-weather travel surface.
18.2.7, 19.2.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Alarm System - Testing and Maintenance
A fire alarm system is tested and maintained in accordance with an approved program complying with the requirements of NFPA 70, National Electric Code, and NFPA 72, National Fire Alarm and Signaling Code. Records of system acceptance, maintenance and testing are readily available.
9.6.1.3, 9.6.1.5, NFPA 70, NFPA 72 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Sprinkler System - Maintenance and Testing
Automatic sprinkler and standpipe systems are inspected, tested, and maintained in accordance with NFPA 25, Standard for the Inspection, Testing, and Maintaining of Water-based Fire Protection Systems. Records of system design, maintenance, inspection and testing are maintained in a secure location and readily available.
a) Date sprinkler system last checked _____________________
b) Who provided system test ____________________________
c) Water system supply source __________________________
Provide in REMARKS information on coverage for any non-required or partial automatic sprinkler system.
9.7.5, 9.7.7, 9.7.8, and NFPA 25 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Construction
2012 EXISTING
Smoke barriers shall be constructed to a 1/2-hour fire resistance rating per 8.5. Smoke barriers shall be permitted to terminate at an atrium wall. Smoke dampers are not required in duct penetrations in fully ducted HVAC systems where an approved sprinkler system is installed for smoke compartments adjacent to the smoke barrier.
19.3.7.3, 8.6.7.1(1)
Describe any mechanical smoke control system in REMARKS. |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Subdivision of Building Spaces - Smoke Barrier Doors
2012 EXISTING
Doors in smoke barriers are 1-3/4-inch thick solid bonded wood-core doors or of construction that resists fire for 20 minutes. Nonrated protective plates of unlimited height are permitted. Doors are permitted to have fixed fire window assemblies per 8.5. Doors are self-closing or automatic-closing, do not require latching, and are not required to swing in the direction of egress travel. Door opening provides a minimum clear width of 32 inches for swinging or horizontal doors.
19.3.7.6, 19.3.7.8, 19.3.7.9 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Some |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Fire Drills
Fire drills include the transmission of a fire alarm signal and simulation of emergency fire conditions. Fire drills are held at expected and unexpected times under varying conditions, at least quarterly on each shift. The staff is familiar with procedures and is aware that drills are part of established routine. Where drills are conducted between 9:00 PM and 6:00 AM, a coded announcement may be used instead of audible alarms.
19.7.1.4 through 19.7.1.7 |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Maintenance, Inspection & Testing - Doors
Fire doors assemblies are inspected and tested annually in accordance with NFPA 80, Standard for Fire Doors and Other Opening Protectives.
Non-rated doors, including corridor doors to patient rooms and smoke barrier doors, are routinely inspected as part of the facility maintenance program.
Individuals performing the door inspections and testing possess knowledge, training or experience that demonstrates ability.
Written records of inspection and testing are maintained and are available for review.
19.7.6, 8.3.3.1 (LSC)
5.2, 5.2.3 (2010 NFPA 80) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Maintenance and Testing
Hospital-grade receptacles at patient bed locations and where deep sedation or general anesthesia is administered, are tested after initial installation, replacement or servicing. Additional testing is performed at intervals defined by documented performance data. Receptacles not listed as hospital-grade at these locations are tested at intervals not exceeding 12 months. Line isolation monitors (LIM), if installed, are tested at intervals of less than or equal to 1 month by actuating the LIM test switch per 6.3.2.6.3.6, which activates both visual and audible alarm. For LIM circuits with automated self-testing, this manual test is performed at intervals less than or equal to 12 months. LIM circuits are tested per 6.3.3.3.2 after any repair or renovation to the electric distribution system. Records are maintained of required tests and associated repairs or modifications, containing date, room or area tested, and results.
6.3.4 (NFPA 99) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| Electrical Systems - Essential Electric System Maintenance and Testing
The generator or other alternate power source and associated equipment is capable of supplying service within 10 seconds. If the 10-second criterion is not met during the monthly test, a process shall be provided to annually confirm this capability for the life safety and critical branches. Maintenance and testing of the generator and transfer switches are performed in accordance with NFPA 110.
Generator sets are inspected weekly, exercised under load 30 minutes 12 times a year in 20-40 day intervals, and exercised once every 36 months for 4 continuous hours. Scheduled test under load conditions include a complete simulated cold start and automatic or manual transfer of all EES loads, and are conducted by competent personnel. Maintenance and testing of stored energy power sources (Type 3 EES) are in accordance with NFPA 111. Main and feeder circuit breakers are inspected annually, and a program for periodically exercising the components is established according to manufacturer requirements. Written records of maintenance and testing are maintained and readily available. EES electrical panels and circuits are marked, readily identifiable, and separate from normal power circuits. Minimizing the possibility of damage of the emergency power source is a design consideration for new installations.
6.4.4, 6.5.4, 6.6.4 (NFPA 99), NFPA 110, NFPA 111, 700.10 (NFPA 70) |
7/26/2023
| No actual Harm with potential for More than minimal harm that is not immediate jeopardy | Many |
| A facility shall have emergency lighting for exits, stairs, corridors and nurses ' stations. Facilities may provide this emergency lighting using an emergency generator or battery-operated lights rated at least one and one-half (1 1/2) hours. In facilities with plans approved on or after January 1, 1999, an emergency generator shall supply emergency power to life support systems as required by the 1993 NFPA 99, Health Care Facilities, incorporated by reference in this rule. In facilities where plans were approved on or before December 31, 1998, the electrical system shall comply to the standards of the National Electrical Code as referenced in the 1985 Life Safety Code. III
|
7/26/2023
| | |
| Complete Fire Alarm Systems.
(B) All facilities shall test and maintain the complete fire alarm system in accordance with NFPA 72, 1999 edition. I/II
|
7/26/2023
| | |
| Sprinkler System.
(C) Facilities that have a sprinkler system installed prior to August 28, 2007, shall inspect, maintain, and test these systems in accordance with the requirements in effect for such facilities on August 27, 2007. I/II
|
7/26/2023
| | |
| Each floor of an existing licensed facility shall have at least two (2) unobstructed exits remote from each other. One (1) of the required exits in an existing multi-story facility must be an outside stairway or an enclosed stair that is separated by one- (1-) hour construction from each floor and has an exit leading directly outside at grade level. One (1) exit may lead to a lobby with exit facilities to the ground level outside instead of leading directly to the outside. The lobby shall have at least a one- (1-) hour fire-rated separation from the remainder of the exiting floor. I/II
|
7/26/2023
| | |
| Each smoke section shall be separated by one- (1-) hour fire-rated walls that are continuous from outside wall-to-outside wall and from floor-to-floor or floor-to-roof deck. All doors in this wall shall be at least twenty- (20-) minute fire rated or its equivalent, self-closing, and may be held open only if the door closes automatically upon activation of the fire alarm system. II
|
7/26/2023
| | |
| (D) A minimum of twelve (12) fire drills shall be conducted annually with at least one (1) every three (3) months on each shift. At least four (4) of the required fire drills must be unannounced to residents and staff, excluding staff who are assigned to evaluate staff and resident response to the fire drill. The fire drills shall include a simulated resident evacuation that involves the local fire department or emergency service at least once a year. II/III
|
7/26/2023
| | |
| The building shall be substantially constructed and shall be maintained in good repair. New facilities shall comply with the requirements in accordance with the provisions found in 19 CSR 30-85.012. Existing licensed facilities shall meet and maintain the facility's physical plant in accordance with the construction standards in effect at the time of initial licensing, unless there is a specific rule governing the subject cited in this section or in 19 CSR 30-85.022, except that those facilities licensed between 1957 and 1965 shall not increase the capacity of any room or the total capacity of the facility without meeting new construction requirements. Existing licensed facilities with plans approved after April 8, 1972 and prior to January 1, 1999, shall comply as Existing Health Care Occupancies with NFPA 101, 2000 edition. Facilities whose physical plant requirement plans are approved on or after January 1, 1999, shall comply as New Health Care Occupancies with NFPA 101, 2000 edition. II/III
|
7/26/2023
| | |
| Electrical Wiring Requirements.
(A) Electrical wiring and equipment shall be installed and maintained in accordance with the NFPA 70, 1999 edition. Facilities that were complying prior to the effective date of this rule with prior editions of the NFPA 70 referenced in this rule shall be permitted to continue to comply with the earlier editions, as long as there is not an imminent danger to the health, safety, or welfare of any resident or a substantial probability that death or serious physical harm would result as determined by the department. II/III
|
7/26/2023
| | |