Inspection Results
-
Facility failed to meet the following Requirement(s):Corrected DateLevel of HarmResidents Affected
Gas-fired water heaters shall be properly installed and vented and all water heaters shall be equipped with a temperature and pressure relief valve. II 8/8/2022